EVOLUTION FROM AIS TO AIM

EVOLUTION FROM AIS TO AIM
Featured image for pdf

Duration: 2 days

Duration: 2 days

EVOLUTION FROM AIS TO AIM

Course objectives

After completing this course, the participant is able to:
  • Describe today‘s evolution from AIS to AIM concepts
  • Explain the main AIS developments that need to be implemented
  • List the main legal and developments aspects (ICAO AIS to AIM roadmap, etc.)
  • State the basics of Aeronautical Information Conceptual Model (AICM)
  • State the basics of Aeronautical Information Exchange Model (AIXM)

Prerequisites

  • Medium to advanced knowledge of Aeronautical Information
  • Good computer skills

Content in brief

Transition from AIS to AIM

  • Introduction
  • Historical background
  • Need for AIS development

AIS Development – Main Aspects

  • Addressing different users
  • Data standardization
  • Emphasizing on digital data
  • Standard Aeronautical Information Exchange Model
  • Improving of conventional AIS products and developing new ones
  • Mixing static and dynamic information
  • AIRAC cycle

Phases for transitioning to AIM

  • Consolidation
  • Going digital
  • Information Management

AIS to AIM roadmap timeline

ICAO AIS to AIM roadmap document

  • Overview
  • Improvement steps

Main Areas of development towards AIM

  • AIRAC Adherence Monitoring (Phase 1, P-03)
  • Quality (Phase 1, P-17)
  • Data Quality Monitoring (Phase 2, P-01)
  • Data Integrity Monitoring (Phase 2, P-02)
  • Aeronautical Information Conceptual Model (Phase 2, P-08)
  • Aeronautical Information Exchange Model (Phase 3, P-09)
  • Electronic AIP (Phase 2, P-11)
  • Electronic Terrain and Obstacle Data (Phase 2, P-13 and P-14)
  • Aerodrome Mapping Database (Phase 2, P-15)
  • Integrated Briefing (Phase 3, P-12)
  • Digital NOTAM (Phase 3, P-21)
  • Training (Phase 3, P-16)

Roadmap to Information Management (IM)

  • Introduction
  • Roadmap
  • System-Wide Information Management
  • Flight and flow information
  • AIS/AIM
  • Meteorology
  • Integration and operational reporting

Annexes

  • Annex 1 – AICM and AIXM
  • Annex 2 – Terrain Information Exchange Model (TIXS)
  • Annex 3 – Airport Mapping Exchange Model (AMXM)
  • Annex 4 – The ICAO Global Plan’s Aviation System Block Upgrade (ASBU)
  • Annex 5 – System Wide Information Management (SWIM)
  • Annex 6 – Flight Information Exchange Model (FIXM)
  • Annex 7 – Weather Information Exchange Model (WXXM)
  • Annex 8 – ATM Information Reference Model (AIRM)
  • Annex 9 – SESAR and NextGen
Entry Point North
T +46 40 694 43 00
www.entrypointnorth.com
sales@entrypointnorth.com